Safeguarding Business
“At the Cambridge project in Bellevue WA, we used AWP for services to preform a water main crossing within Coal Creek. I would like to express my gratitude for an exuberant job well done. (For) those who do not know, Coal Creek is one of the main roads running through Bellevue Washington which allows a vast majority of traffic to reach the 405 freeway. This is a dangerous road with daily traffic concerns. The team directed out by Daisy Rubish to contain traffic and control our safety during this task has caused me to address their excellent ability for a job well done!
The AWP team stayed calm and collected as they overlooked the design plan to overcome the challenge set before us. As the clock was ticking towards impossible odds, your team pulled through and was able to put it all together for us. Essentially, they saved this daunting task from failure which could have caused delays, and over all cost us the job, as this task was a key element of success on this project. This type of impact didn’t just happen once, but twice during the four-day crossing. I look forward to working with you all again on the next crossing.”
